The flow, in ten steps
Steps 1 to 8 are the first build. Certificates and construction use the same project file later.
- 1 Enter the addressAddress or Lot/DP. You confirm the exact lot on a map.You. Free.
- 2 Say what you wantSubdivide, second dwelling, new house, or not sure yet.You. Free.
- 3 Site checkWhat the maps show: known, not known yet, and what looks possible.See the screenMap lookup, not AI. Free.
- 4 PathwayExempt, complying or DA. A planner confirms it.Planner. Feasibility fee.
- 5 Document checklistEach report: get a quote, accept it, track delivery.See the screenYou. Paid per report.
- 6 Document checkEvery upload matched to the lot and the proposal.AI reads. A planner decides.
- 7 Planner reviewStatement of Environmental Effects drafted by AI, corrected and signed by a planner.See the screenPlanner. Stage fee.
- 8 Lodgement packOwner consent and fees. Lodged by hand on the NSW Planning Portal.Planner. Stage fee.
- 9 AssessmentEach council request becomes a task with a due date.See the screenCouncil. Hourly.
- 10 DeterminationConditions listed one by one, each with an owner.Council.
- You
- DIYPlanner, automatic
- Planner (a named person)
- Council
Four rules hold at every step: anything not confirmed shows as "not known yet", the site check is never a verdict, a planner signs before a client relies on it, and a person lodges with council, not a bot.
Click through the screens
One sample subdivision in Kenthurst, from the site check to council's questions.
Site checkThe lot on a plan, what sits on the land, and what looks possible.
Documents and quotesThe reports council needs, their quotes, and the fee for each stage.
Planner reviewThe planner's screen: what the AI found in each report, and the lodgement pack.
With councilCouncil's letter split into tasks, with planner hours.
Sketch a planDraw a building outline on the lot and drag its walls. An extra, not in the flow yet.
What we need to hear
- Which steps are wrong, missing or in the wrong order.
- Which documents and approvals have been left out.
- What each stage should cost, and who is paid for what.